Wallet custody, cryptographic trust boundaries, vulnerabilities, audits and practical defensive habits

Metis Hybrid Rollup reaches Devnet, with post-quantum path not yet enabled

For anyone relying on a rollup withdrawal, the distinction is between a shorter wait being designed and one already available. As reported on November 11, 2026, Metis said its Hybrid Rollup had launched on Devnet. The design adds validity proofs to its existing optimistic Rollup architecture so execution results can be verified on-chain, with the aim of reducing withdrawal waits. When Metis first proposed the design at ETHDenver in March 2023, its stated goal was to reduce the wait from seven days to hours; the Devnet announcement did not establish that this goal had been reached.

Metis described two parts of the upgrade: combining optimistic challenges with validity proofs based on Ziren, an open-source zkVM developed by ZKM, and adding support for ML-DSA post-quantum signatures to its decentralized sequencer, DSeq. The Devnet codebase supports both elliptic-curve cryptography (ECC) and post-quantum cryptography (PQC) paths, but only ECC is enabled initially. Metis plans to switch modules to PQC later.

A testnet planned for the first quarter of 2027 is intended to demonstrate both verification paths and further test the Hybrid Rollup architecture. Separately, Metis published a discussion draft proposing to convert the OVM Token into a native asset to more closely match a standard EVM execution environment. Governance has not approved that proposal, and its snapshot block and timetable remain undetermined.

Further reading